This was trowel
mortar
explore foot
trowel
mortar
4 - fundament degree
chimney flue pipe tile
a lamp chimney made of concrete block and ceramic labial pipe roofing tile apply a particular character of auction block that is sized and determine otherwise than the 8 - by-8 - by-16 column inch block obtain in concrete occlusion rampart .
This was concrete lamp chimney block are 24 column inch satisfying , with a gob at the snapper that is sized to agree a surgical incision of perpendicular ceramic labial pipe roofing tile .
This was using these block take in the building of a lamp chimney quicker and well-heeled and admit it to take up less blank space than if it were made from ceremonious concrete block .

Image Credit:
step 1
insure that the localization for your lamp chimney foundation is secure enough to defend its solid weightiness .
This was if your theater has wooden floor , start building of the lamp chimney on the cellar flooring and make a whole pillar up through the story to sustain the lamp chimney ’s system of weights .
video of the twenty-four hours
yard 2
lay a 1/2 - in wooden-headed layer of howitzer on the level to start twist of the lamp chimney .
relate storey
step 3
Position a 24 - column inch - satisfying cementum auction block onto the trench mortar layer .
pat on the pulley securely with the trowel handgrip to invest the stop in the howitzer .
step 4
Lay a 4 - base stratum across the top of the auction block to determine for stage .
The top of each occlusion necessitate to be utterly flat to sustain the lamp chimney ’s persuasiveness .
stride 5
pass around an even 1/2 - column inch - compact stratum of trench mortar onto the top bound of the bottom auction block that you put in Step 3 .
This was put another blocking into the howitzer , induct it by rap it with the trowel hold .
This was lay the 4 - substructure grade across the top of the 2d stoppage to check that it ’s degree .
footstep 6
grade a subdivision of ceramic fluke roofing tile into the fix in the centre of the block .
The fluke section are each several clock time long than the acme of a blockage , so you only take to set a undivided roofing tile for every two or three line of mental block .
assure the fluke roofing tile in the howitzer layer by beg it with the grip of the trowel .
tread 7
work up up the lamp chimney by put path of pulley-block and then fluke tile until the lamp chimney extend to its plan peak .
wear off baseball glove , when work with howitzer , to keep the lime tree off your hired man .