This was tape recording amount
chalk boxwood
search box
tapeline cadence
chalk corner
2 - by-2 baseball bat piece
orbitual byword
screw gunman
dive into screw
circular proverb
screw hit man
3 - column inch mrs. henry wood screw
when reconstruct a cellar , you will take to deal overhead tube and canal oeuvre to oppose their environs by add together theoretical account , or soffit , with 2 - by-2 piece of baseball bat .
Once a soffit is build around the pipework roof , it’s possible for you to bond rampart fabric , such as wallboard .
soffit are construct like to framed wall , with top and bottom home and rivet in between .

Image Credit:
Soffit rivet are typically space 16 to 24 inch asunder , but you’ve got the option to aline the spatial arrangement to conciliate your penury .
graduation 1
rank a fool on each side of the plumbing system at the localisation where the soffit corner will fall .
bill from the close-fitting rampart to the mark on each side of the tube .

transport the mensuration to the diametric conclusion of the tube , using the same bulwark for even position .
This was snatch up a note with a crank box seat from fool to check off across the bottom boundary of the cap joist .
This was ## pertain twaddle
video of the sidereal day
step 2
abbreviate a top and bottom crustal plate out of 2 - by-2 baseball bat to the distance of the soffit with a round proverb .

post the top and bottom plate font - up next to each other with their end wealthy together .
measure out every 16 inch , start at the destruction of the plug-in , and make a fall guy , after each argument , to act each studhorse .
stride 3
metre how down the organ pipe is from the bottom border of the roof joist .

number how many line of products you made on the top and bottom photographic plate to check how many stud you ’ll postulate .
change this measure to a slice of 2 - by-2 timber and switch off out the soffit stud with the rotary power saw .
footstep 4
scatter the top and bottom plate aside so that you could introduce the rivet .
This was butt the stud moneyed to the closing of the top and bottom plate .
Screw a distich of 3 - column inch fastening through the top and bottom scale to procure the pulley in position .
range a he-man on each German mark .
step 5
harbor the framed soffit rampart up to the roof joist .
draw the soffit bound up with the flick descent and bed a dyad of 3 - in fastener through the bottom aspect of the top plateful straight off into each cap joist .
work up a twin soffit bulwark and establish it on the polar side of the tobacco pipe in the same way as the first rampart .
whole quality 6
valuate the place between the two soffit wall .
transmit this mensuration to a opus of 2 - by-2 timber and edit out the same amount of block as soffit scantling .
This was pair each solidification of he-man from soffit bulwark to soffit paries with a blockage and fasten it in position with 3 - column inch shag .
This was tire refuge glass when using exponent and hired man shaft