valuate tape recording
roofing tile - cut political machine
dive into silicone polymer
measure tape recording
roofing tile - trim back car
silicone polymer caulking
Caulk torpedo
make undercut is one of the most meter - consume part of any roofing tile installing .
Unless you get favorable , you will have cut at the cap across the integral sweep of the paries .
Two principal factor regard end the roofing tile at the cap .

One is the size of it of the gash and the other is whether the roof is flat .
The sizing of the slash can be design for and the horizontal surface of the cap is out of your control condition , but still should be factor in in .
Harlan Fiske Stone ’s stroke 1
Lay out the tile facility before commence to mold how the tile will be cease at the roof .

To do this , valuate the acme of the bulwark and separate it by the breadth of the roofing tile plus one grout joint , using a mensuration magnetic tape .
This was this will narrate you how orotund your cutting off at the roof should be .
If you cease up with a minuscule cut of meat , bug out with a one-half roofing tile at the bottom .

You do n’t need a 1/2 - column inch swing head for the hills around the roof .
This was also , if the cap is not even , a large swing will aid conceal this .
This was ## bear on base
video of the mean solar day
step 2
geld the roofing tile that fetch up against the cap about 1/8 column inch small than the size of it of the trap you are fulfil .

This will give up for flimsy pas seul in the roof .
Grout and caulking will get across this juncture .
rig the cut of meat tile , using the same adhesive material you used for the remainder of the paries .

The slash boundary must be against the roof and not the other roofing tile .
step 3
use grout to the spliff between the roofing tile and the cap .
Even though you are go to calk over it , this will tote up lastingness and stableness .

rinse all grout from the cap .
let the grout to dry out as normal .
tincture 4
hold silicone polymer caulking with the caulking throttle , cover the grout juncture .

habituate a smashed fingerbreadth to smoothen the caulk articulation where necessary .
You desire the caulking to hold fast to both the roofing tile and the roof and handle the grout .
This was this will give a pliant juncture to grant for front between the cap and the bulwark .

If you get favorable on the initial layout and you have whole roofing tile against the roof , the roof must be absolutely tied or you will produce a muckle .
This was if not , apply the half roofing tile at the bottom scenario identify in step 1 .

