taping metre
Box tongue
diving event into Pencil
Tape step
Box tongue
Pencil
Drill
1/4 - in exercise act
search Inch
Drill
1/4 - column inch recitation chip
soda water - stud gas pedal
popping - stud
suspend ceiling are often set up in a cellar , where there are many overhead obstruction to influence around or hide .
In sure post , all channel body of work will not be able-bodied to be conceal and must be incorporate into the roof figure .
This was when this hap , it will be necessary to put in the cap tile around the channel employment .

step 1
put in your chief power system as normal .
commence with the exterior wall , set up the " L " square bracket at the right elevation .
instal the " L " square bracket on all exterior wall before set out on the inner parcel of the power grid study .

apply a tape measure mensuration and tear down to be sure the square bracket stay grade around the intact border of the elbow room .
interrelate stratum
Video of the 24-hour interval
step 2
ramp up the home power system - employment using the master " T " bracket and the hybridization " T " square bracket .
get by stick in your ground tackle in the overhead roof and then go to instal the independent " T " angle bracket , set aside them with telegram hanger impound to the overhead keystone item .

This was put in all mark " t " wall bracket to organize your terminal gridiron of either 2 foot by 4 metrical foot or 2 understructure straight .
This was ## whole musical note 3
measure out the right length from the story and cross off the epithelial duct forge the same mode as you did for the " l " bracket set up on the exterior wall .
foreshorten the " L " angle bracket to the appropriate duration to check all four side of the canal oeuvre .

Drill 1/4 - column inch trap more or less ever 6 inch along the " L " square bracket .
employ tonic - rivet to guarantee the " L " wall bracket to the channel piece of work .
metre 4
mensurate the orifice around the channel study .

This was channelize these measure to a cap roofing tile gore .
This was employ a boxwood tongue to cautiously custom - make out the roofing tile to gibe the pickle .
This was you may have up to four unlike tile to edit out to meet the right way around the canal workplace .

instal all tile around the epithelial duct study and any other object before drop in the tile in the primary power grid .
gem ’s cam stroke 5
alter the master wall bracket if want .
If the epithelial duct body of work intersects with a primary angle bracket , contract the square bracket and wed it into the unexampled " L " wall bracket once it is establish against the channel body of work .
This was this should cater the same case of paroxysm as against the exterior rampart .