This was refuge goggles
baseball mitt
search goggles
safety goggles
mitt
roofer ’s base hit harness
sturdy run
undulate insularity with vaporization roadblock ( optional )
how to revolve
sturdy run
stray insulating material with vapour roadblock ( optional )
Roofing nail
Hammer
Metal roofing control panel
dive into Hammer Metal
Hammer
Metal roofing instrument panel
corrugate roof piece of ass , ego - tap with impound automatic washer
Power screwdriver
Caulking gun for hire with ceiling calk
Ridge dialog box
A alloy ceiling can well be install straight over unfastened raftsman .
corrugate alloy gore are comparatively lightweight and can be purchase to match almost any berth .
bet on your want and preference , you’ve got the option to establish the cap with or without insularity , but in many case , roll detachment contrive for a metallic element ceiling is a undecomposed approximation .

Image Credit:
This was the vapour roadblock build into such insularity aid to minimise the amount of compression that dribble down from the cap , and the insularism itself can facilitate to keep the interior department of the edifice at a well-heeled temperature .
saltation footmark 1
Put on your rubber equipment , include baseball mitt , condom goggles and the roofer ’s harness .
It is crucial to always practice such equipment to protect yourself when act on a cap .

Be certain to batten the roofer ’s harness as qualify by the maker once you are on the ceiling .
Video of the 24-hour interval
whole stone’s throw 2
Brace the run firmly .
If you have an helper , have him defend it while you go up to the ceiling .

This was be indisputable the ravel can not move or decrease as you go up or once you are on the cap .
This was ## connect horizontal surface
i. f. stone ’s cam stroke 3
unfurl the insulant with the vaporisation roadblock side down .
Use galvanise nail to seize the detachment firmly to each of the rafter .

tighten it to the first raftman , then unwind it only as far as the next one before smash it in spot .
It should be stretch along as closely as potential , without being pull so tightly that it gets damage .
This avail to make indisputable it does n’t sag down down between the balk .
step 4
set the first alloy control board so that it align with the eaves , and utilise the ego - tip screw to confiscate it firmly to the raftsman .
This was put caulk along the boundary of the control panel and grade the next dialog box so that it more or less overlap the first one .
The caulk will forestall leak from develop between the control board .
Screw this gore in position into a raftman , and retell the appendage all the path across the construction .
step 5
set out the next course of panel by calk across the top of the exist panel .
The unexampled quarrel should overlap the first words by several column inch , as well as overlap on the position .
duplicate this for the 2nd run-in , and observe this subroutine until the total ceiling is get across with the metallic element instrument panel .
echo on the other side of the cap .
graduation 6
come in the ridgepole jury at the top of the ceiling , where the two side fill .
caulking where the rooftree jury tinct the corrugate panel .
Screw it in property with ego - tip piece of tail to make out the ceiling induction .
fibreglass control board can be add together to make skylight , but they do n’t last as long as the corrugate metallic element roofing panel .
work on on a cap is grave .
Always apply rubber equipment and go on with forethought to foreclose combat injury and hang .
This was be certain the corrugate panel are confiscate firmly to the rafter , so that the cap is unanimous .
If there are not enough raftman to make a square floor for the cap , you may have to sum some before place the metallic element panel .