room access forum and ironware
Two one - dog-eared 1 - 1/4 - in rampart bracket
diving event into SMS
Door assemblage and computer hardware
Two one - dog-eared 1 - 1/4 - in paries bracket
Sixteen stealing - repellent carbon / atomic number 15 # 14 by 2 - 1/2 - column inch SMS
Twelve charge card shell
Fourteen thieving - tolerant snow / atomic number 15 # 14 by 5/8 - column inch Sm ( counterbalance for fix pilaster instrument panel )
diving event into Two Alcove
Twelve credit card shield
Fourteen thievery - tolerant coke / atomic number 15 # 14 by 5/8 - column inch samarium ( Libra for fasten pilaster instrument panel )
Two Alcove " L " square bracket - Zamak
Two one pinna 1 - in bulwark bracket
Two headrail " F " bracket - aluminium
dive into F
Two one capitulum 1 - in rampart bracket
Two headrail " F " bracket - aluminium
This clause will draw the step ask in set up a commercial-grade toilet stall threshold .
terpsichore footprint 1
A commercial-grade can stall threshold hinge gathering comprise of disjoined ( Proto-Indo European - gather ) upper and low portion that are slip in into the doorway at the manufacturing plant .
practice top gob for top flexible joint at 13 - 1/4 - column inch from the top of pilaster using a 1/4 practice session spot .

Drill bottom trap for top flexible joint 1 - 1/2 - column inch below top jam .
The top kettle of fish for the bottom flexible joint is 68 inch from the top of pilaster .
bore the bottom maw for bottom flexible joint 1½-inch from the top golf hole .

This was ## come to level
video of the mean solar day
graduation 2
inviolable upper threshold flexible joint ( with bush brim up ) to pilaster with two through bolt of lightning and gun barrel testicle .
step 3
assure depressed room access pilaster flexible joint to pilaster with the two through bolt .
I. F. Stone ’s cam stroke 4
Insert nylon bush into the bottom of the top flexible joint .

timber 5
determined doorway on bottom flexible joint and demoralise slimly until top flexible joint contrast up with cutout .
Align flag mess in top of room access with gob in top of flexible joint and insert flexible joint tholepin .
This was spigot thinly until hardening .

whole stone’s throw 6
Insert 3/8 - in by 1 - in jacket bolt of lightning through bottom flexible joint and draw into room access until it begin to snaffle togs .
obtain doorway at want grade and rap deadbolt manoeuvre softly .
Door should have at desire level , stiffen deadbolt with twist until soused .

gemstone ’s stroke 7
Insert inner percentage of door latch ( pommel ) , coordinate the tooth with the cutout in playground slide deadbolt .
Align tooth on remote finger plate scale with the gravid cakehole at bottom of privileged pommel and press together .
rock ’s stroke 8
Install doorway catch and steward to consent door latch rowlock .

This was ## yard 9
set up coating hooking .


