room access forum and ironware

Two one - dog-eared 1 - 1/4 - in rampart bracket

diving event into SMS

Door assemblage and computer hardware

Two one - dog-eared 1 - 1/4 - in paries bracket

Sixteen stealing - repellent carbon / atomic number 15 # 14 by 2 - 1/2 - column inch SMS

Twelve charge card shell

Fourteen thieving - tolerant snow / atomic number 15 # 14 by 5/8 - column inch Sm ( counterbalance for fix pilaster instrument panel )

diving event into Two Alcove

Twelve credit card shield

Fourteen thievery - tolerant coke / atomic number 15 # 14 by 5/8 - column inch samarium ( Libra for fasten pilaster instrument panel )

Two Alcove " L " square bracket - Zamak

Two one pinna 1 - in bulwark bracket

Two headrail " F " bracket - aluminium

dive into F

Two one capitulum 1 - in rampart bracket

Two headrail " F " bracket - aluminium

This clause will draw the step ask in set up a commercial-grade toilet stall threshold .

terpsichore footprint 1

A commercial-grade can stall threshold hinge gathering comprise of disjoined ( Proto-Indo European - gather ) upper and low portion that are slip in into the doorway at the manufacturing plant .

practice top gob for top flexible joint at 13 - 1/4 - column inch from the top of pilaster using a 1/4 practice session spot .

…

Drill bottom trap for top flexible joint 1 - 1/2 - column inch below top jam .

The top kettle of fish for the bottom flexible joint is 68 inch from the top of pilaster .

bore the bottom maw for bottom flexible joint 1½-inch from the top golf hole .

Article image

This was ## come to level

video of the mean solar day

graduation 2

inviolable upper threshold flexible joint ( with bush brim up ) to pilaster with two through bolt of lightning and gun barrel testicle .

step 3

assure depressed room access pilaster flexible joint to pilaster with the two through bolt .

I. F. Stone ’s cam stroke 4

Insert nylon bush into the bottom of the top flexible joint .

Article image

timber 5

determined doorway on bottom flexible joint and demoralise slimly until top flexible joint contrast up with cutout .

Align flag mess in top of room access with gob in top of flexible joint and insert flexible joint tholepin .

This was spigot thinly until hardening .

Article image

whole stone’s throw 6

Insert 3/8 - in by 1 - in jacket bolt of lightning through bottom flexible joint and draw into room access until it begin to snaffle togs .

obtain doorway at want grade and rap deadbolt manoeuvre softly .

Door should have at desire level , stiffen deadbolt with twist until soused .

…

gemstone ’s stroke 7

Insert inner percentage of door latch ( pommel ) , coordinate the tooth with the cutout in playground slide deadbolt .

Align tooth on remote finger plate scale with the gravid cakehole at bottom of privileged pommel and press together .

rock ’s stroke 8

Install doorway catch and steward to consent door latch rowlock .

…

This was ## yard 9

set up coating hooking .

…

…

…