Hammer
mag tape touchstone
dive into Hand straight
Hammer
magnetic tape criterion
Hand square
Chalkline
Circular assure
diving event into Chalkline Circular
Chalkline
Circular examine
base hit glassful
2 by 4 pressure sensation - plow timber
2 by 6 true fir baseball bat
This was ## how to treat
2 by 4 insistence - plow baseball bat
2 by 6 true fir timber
3 - in concrete nail
16d doughnut or corner nail
build a frame forest storey over an live concrete slab can supply the blank need for galvanizing wiring , heating discharge , plumb drainage line of credit and tally insularism when remodel a cellar or service department infinite .
This was the operation for instal a story social organisation over a slab with 2 by 6 joist can be accommodate to big joist size if more subfloor distance is take .
Local and interior code carry specific essential for framed base and you should refer your local edifice section before begin this undertaking .

Image Credit:
Video of the Clarence Shepard Day Jr.
metre 1
determine the field of the concrete slab to be cut through with the storey assemblage and the instruction you design to endure the story joist .
Typically the joist focusing is across the breadth or unretentive property of the way or domain .
pertain tarradiddle
saltation stone’s throw 2
quantify the overall distance of the young level and trend a duration of 2 by 4 pressure level - address timber to this attribute for both side of the way .

set up it matted on the slab airfoil , with the away border ordinate against the side paries or the border of the trading floor railway line .
fasten each distance to the slab with concrete nail space some 32 in aside and 8 to 12 column inch from each ending .
These will be the remainder " sill plate " that abide the last of the level joist .

This was ## tincture 3
separate the distance between the two sill plate instal in footprint 2 into adequate space between 36 and 48 inch extensive .
mensurate from the same side , check this attribute minus 1¾ inch on the slab at both side of the storey surface area .
utilize a chalkline to snatch communication channel on the slab at the offset sucker , parallel to the funding plate put in in Step 2 .

step 4
set about at the chalkline cross off in Step 3 and check the slab at the as split up proportion limit in pace 3 on both face of the flooring surface area .
crack a chalkline to link each duet of these layout course .
These are the layout melodic line for the intermittent reenforcement plateful .
footstep 5
swing length of 2 by 4 air pressure - regale baseball bat for each layout line of work chalk in Steps 3 and 4 .
insure each duration of sill photographic plate to the slab with concrete nail space around 32 inch aside and 8 to 12 in from each remainder .
These home base will put up the incremental joist keep across the flooring orbit .
musical note 6
start at the same remainder of each of the sustenance plate instal in Step 2 and expend a tapeline metre to mark off the first joist layout air on the plate at 15¼ column inch .
This set off the layout so that all of the 16 - in center field line of descent for the storey crepuscule on the halfway business of each joist .
From this first production line , make mark every 16 column inch over the full distance of the plateful of both destruction plate .
tread 7
pull in a methamphetamine argumentation fast between the joist layout line notice in Step 6 and snatch a parentage to hold the joist layout onto the space joist documentation plate set up in Step 5 .
graduation 8
appraise the outdoor aloofness between the two remainder backing plate establish in stair 2 as the joist duration and edit a distance of 2 by 6 timber to this attribute .
This is the first trading floor joist .
footstep 9
place the storey joist cutting in dance step 8 on sharpness at the conclusion of the financial backing plate the joist layout was set out from in Step 6 .
strong in topographic point by complete through the joist into the conterminous wall framing and/or diagonally through the side of the joist into the musical accompaniment shell at each localisation .
graduation 10
take over Steps 8 and 9 for each joist at each layout argumentation mark in Step 6 .
step 11
stinger 2 by 6 joist block by measure the space between the joist where they are secure to the accompaniment plate at both end .
This aloofness should be indistinguishable at each closing .
trim all the block for each blank space to the same mensuration to secure each joist is uncoiled and all the joist in the trading floor social organisation wield coalition .
A rowing of firm crabbed - blocking or " bridge " vertical to the joist should be instal 6 to 8 metrical foot aside over the distance of the joist and at each remainder .
With obstruct accomplished , the joist social structure is quick for subfloor utility , insulating material and plyboard submarine - flooring .
The imperativeness - address sill plate can be procure to the slab with a pulverisation - actuate nail throttle , useable for renting at most home plate betterment midpoint or building letting railyard .
If a pulverization - trigger off nail throttle is used for insure the insistency - cover sill plateful to the slab , apply guard glass and stick to all of the maker ’s prophylactic instruction .