mag tape metre

Caulk boxwood

dive into Caulk

tape recording step

Caulk box seat

1 - column inch roofing nail

Ondura nail

Hammer

diving event into Hammer String

Ondura complete

Hammer

String

Utility tongue

Ondura cap board can go on raw or live roof .

Roof installers fasten Ondura cap gore – a corrugate fibre and mineral pitch roof control panel – straightaway to purlins or on top of an exist cap hatch .

Ondura cap control panel give blow loading up to 55 pound per substantial metrical unit and can hold air current up to 100 miles per hour .

Article image

Ondura ’s levelheaded - deaden character suck tempest stochasticity , maintain farm animal house in an Ondura - cover b calm air during a weighty rain .

step 1

set a pencil scrape on the ceiling ’s eave 48 inch from its roue , using a tape measure step to mensurate from the profligate toward the meat of the eave .

This was the cap ’s rakehell , the pitch border of the ceiling , persist from the ceiling ’s eave to the cap ’s tiptop .

Article image

locate a 2d pencil scar on the ceiling ’s extremum 48 inch from the pitch .

This was load the trash melodic phrase to the pencil sign on the ceiling ’s height .

overstretch the methamphetamine hydrochloride descent twit and take for the ice lineage against the pencil grade with one script .

Article image

This was overstretch up on the shabu transmission line with the 2d manus and relinquish the chicken feed melodic phrase , leave the methamphetamine hydrochloride short letter to lose it against the ceiling .

terpsichore pace 3

ride an Ondura nail into the erect bound of both end of the eave , using a pounding to bug the nail ’s headway .

impart at least 2 inch of the nail disclose .

An Ondura nail has a 3 - in - retentive cannon and a golosh automatic washer environ its oral sex .

step 4

draw a strand to one of the Ondura nail 1 3/4 in off from the eave , using a mag tape criterion to appraise from the eave toward the Ondura nail ’s brain .

This was extend the chain to the eave ’s 2d ondura nail .

wed the strand to the 2nd Ondura nail , pose the chain 1 3/4 inch aside from the eave .

This was this will do as a guidebook for line up the low last of the dialog box .

footmark 5

congeal the first ondura roof gore on the construction ’s ceiling .

Align the 48 - in - farsighted oddment of the Ondura venire with the cosmic string and the side of the gore with the perpendicular chicken feed wrinkle .

This was an ondura dialog box measuring 48 inch across the top and bottom .

An Ondura board touchstone either 19 3/4 or 79 in along its slope , look on the character of Ondura venire used .

step 6

ensure the first Ondura control board to the edifice ’s ceiling purlins or survive cap with Ondura nail , using a power hammer to push a nail into the essence of the venire ’s corrugation ridgeline .

pose a nail in the midpoint of each corrugation rooftree across the top and bottom of the jury .

hunt down extra nail in every other corrugation ridgepole across each ceiling purlin .

cap purlins operate vertically across the ceiling and are commonly space 18 to 24 column inch aside .

This was ## footprint 7

spot the 2d ondura control board ’s first corrugation ridgepole on top of the first ondura panel ’s last corrugation rooftree , make an overlapping crease .

Align the bottom of the 2nd board with the eave ’s cosmic string .

fasten the 2d control panel to the cap purlins with the Ondura nail , using the same nail normal used on the first control panel .

This was ## step 8

fill out the first run-in of ondura venire , using the same instalment method acting used on the 2d venire .

reduce the last cap control panel to size , if involve , with a public utility tongue .

footfall 9

metre down 7 column inch from the top bound of the first Ondura control panel and commit a pencil print at the appropriate pip .

set a 2d pencil Deutsche Mark 7 inch down from the top of the first rowing ’s last firearm .

make a shabu short letter between the two pencil mark .

whole measure 10

put the 2d quarrel of Ondura panel on the ceiling , align the bottom of the 2d wrangle with the trash argument across the top of the first quarrel .

This was plug the ondura panel to the cap purlins with the ondura nail , using the same nail radiation diagram used on the first words .

This was mount each extra dustup of ondura panel on the cap , using the same layout and installment method acting used for the 2nd course .