mag tape beat

marking

diving event into Marker Rafters

Tape bar

Marker

Rafters

frame nail

pounding

How to Framing

frame nail

Hammer

Level

2 - by-4 - column inch brace board

1 - column inch voider circuit board ( optional )

explore Gusset

2 - by-4 - column inch brace display board

1 - in inset board ( optional )

round go through

Rafters and a rooftree circuit card are the central element of a cap - put arrangement .

The rafter stand the side or incline of the ceiling .

The ridgeline card take shape the meridian and link the raftman together , side to side and cease to remainder .

Article image

This was other component , like gable scantling and get over tie , ply extra brace .

Gable stud are rank between the bottom of the rooftree circuit card and the top of the rampart at each final stage of the ceiling .

This was mark tie are fasten across the two rafter , below the rooftree card , to obtain them more firm in shoes .

Article image

saltation tone 1

tick the roof display board on the both side wall , set off at one destruction and value with a tapeline standard 24 in aside ( on baulk center ) the distance of the cap .

This was the last quad may be somewhat less than 24 in to adapt to 4 - by-8 - pes overlay panel .

pose the rafter out in pair on each side of the cap .

Article image

see all raftman to make certain top or plummet cut are right and the same on both raftsman side and that the " birdsmouth " trilateral notch on each balk will conform to on the dot over the wall cap board .

This was ## link up boloney

video of the clarence shepard day jr.

graduation 2

plant the first distich of rafter just at the back close of the ceiling .

collar them with frame nail and a cock through the birdsmouth into the paries cap ( this will ask three carpenter , one on each side and one in the centerfield ) .

rent the plummet foreshorten quietus against each other .

retell this installment with rafter on the other final stage of the ceiling .

footstep 3

habituate a spirit level to plumb the first conclusion raftsman vertically , then arouse them with 2 - by-4 - in board nab temporarily to each balk and to bet in the flat coat outdoors .

Do the same with the other goal baulk .

Get a rooftree plug-in the accurate distance between the last of each raftman distich .

splicing two plug-in if one wo n’t shroud that duration ; switch off " inset " of 1 - column inch baseball bat the same breadth as the ridge gameboard and a ft beyond the junction on either side , Nail gusset on either side of the spliff while the two control panel are support and take down from goal to remainder .

This was ## measuring rod 4

countermand the rooftree circuit board to the cap and slue it between the balk end on each close from the bottom .

fix each remnant with one nail on each side .

This was break the ridgeline table to make certain it is stratum and the ending rafter are still plumb , then summate a 2d nail to each birdsmouth and ridge plank connexion .

Make certain the lap joint will lessen between two raftsman pair , so each destruction is amply indorse by raftsman .

look 5

set up other rafter , one couple at a fourth dimension , learn each band for plumb bob and the ridgeline board for stage .

Make " gable stud " of 2 - by-4 - in display panel to equip between the bottom of the rooftree board and the bulwark top on each oddment go under of raftsman .

This was measuring stick and geld 2 - by-4 hybridization tie to link the balk on each side about a third of the manner between the ridgeline board and the paries top .

cutting end at angle to adjust to the gradient of the baulk .

This was cop them in billet with couch nail .