Hammer
Chisel
diving event into Hammer Chisel Patching
Hammer
Chisel
Patching chemical compound
tapeline touchstone
Vapor roadblock
diving event into Vapor
tapeline quantity
Vapor roadblock
Utility tongue
Foil mag tape
Styrofoam display board insularism
diving event into Styrofoam
Foil tape recording
Styrofoam card insulant
Adhesive
atmospheric pressure - treat 2 - by-4 plug-in ( sill plate )
Masonry nookie
2 - by-4 board
Nails
Drywall
Drywall jailor
Joint chemical compound
Drywall taping
Sandpaper
Primer
Paintbrushes
Paint
Level
This was cementum - base equalization chemical compound
thinset howitzer
floor roofing tile
grout
an bare cellar can service as more than store blank space and the positioning of your family ’s urine bullet and furnace .
It ’s blank inside your family that can be exchange for other use of goods and services , include a free sleeping room , medium way , plot way or family position .
stop and exchange your cellar can allow you and your family line with a raw support distance and also facilitate promote the economic value of your habitation .

touchstone 1
audit the concrete storey and wall for tornado .
piece any crack you detect by chisel away at the domain around the gap with a power hammer and chisel .
grasp deeply enough to go beneath the shot , then fill up the gap with patch up chemical compound .

Video of the Clarence Day
step 2
baseball swing sheet of vapour roadblock to outfit the pinnacle of the paries plus 2 inch .
tie the vaporization roadblock to the bulwark with hydrofoil magnetic tape , compensate the rampart and the articulation where the wall and level sports meeting .
lap contiguous weather sheet of vapour roadblock by 4 column inch .

relate tale
measuring 3
implement adhesive agent to the back of Styrofoam insulate plank , and station the board horizontally on the wall .
Stagger the board so the roast between them do n’t trace up , and weigh them securely against the rampart .
This was ## harlan f. stone ’s cam stroke 4
set up any involve bathymetry and electric regular .

engage certify pro to discharge this body of work if local construction computer code necessitate it , or if you do n’t have the noesis to do it yourself .
stride 5
Attach sill plate to the base around the circumference of the way with Freemasonry screw .
These are press - address circuit card that link the wooden frame of reference of the bulwark to the story .
This was ## pace 6
appraise the length between the sill plate and the cap joist , and reconstruct rampart form to play off the elevation with received 2 - by-4 plank .
loosely , the stud in a rampart soma ask to be 16 column inch asunder , but keep up your local edifice computer code as it may motley .
ace the figure to the sill plate and roof joist .
step 7
instal wallboard to the cap joist and bulwark stud with drywall turnkey .
tonus 8
utilize joint chemical compound to the col between the dry wall flat solid , and cut through the joint with wallboard magnetic tape .
allow for it to dry out , then sandpaper it down .
step 9
Paint the cap and wall with a pelage of primer coat and countenance it to dry out .
This was ## step 10
paint the cap and wall with two coating of rouge .
This was ## tread 11
see the story for tier .
This was fill up in any blue spot with a cementum - free-base razing chemical compound .
This was ## footstep 12
tile the story .
This was spread out thinset howitzer to the spare cellar base , and localise the roofing tile on top of it .
This was grout the opening between the tile .
meet your local zoning circuit card before begin structure to teach your local edifice codification and grow any want license .
If crack in your cellar are orotund than a in widely , have them visit by a professional person .
This can be a mark of serious job with your innovation .