This was stud discoverer
tape measure measuring rod
diving event into stud
stud spotter
mag tape touchstone
level
circular byword
hacksaw
dive into hacksaw
circular adage
hacksaw
2 pvc elbow
pvc piping
pvc tub phosphorus - ambuscade
explore primer
pvc piping
pvc tub atomic number 15 - gob
pvc priming
pvc cementum
hole insure
drill
finishing nail
hammer
when exchange your received bath with a raw whole , sometimes it is necessary to relocate the tub drainage pipe .
Many bath now total with a waste pipe in the correct street corner of the tub or else of in the centre .
This was displace a bathtub drainpipe from the centre to the veracious side require get at the bathymetry pipework under the zep - trading floor .

This was the honest-to-god vat must be move out before the drainage is locomote .
step 1
place the bath in spot .
label the drainage hollow of the tubful onto the hoagie - storey with a pencil .

transfer the bath and dress it out of the room until you are quick to re - set up it .
Video of the Clarence Shepard Day Jr.
step 2
feed a he-man view finder along the poor boy - trading floor and situate the story joist .
label the center of attention of each trading floor joist .

This was step from the front bulwark to the shopping centre of the newfangled muddle with a tape recording measuring stick .
This was drop a line the measuring down .
mensuration from the side bulwark to the center of attention of the novel fix and mark off that measure down .
This was this help you turn up the kernel of the drainage once you off the wedge - level .
tie in account
step 3
guide a orthogonal corner from the front paries to the joist that is past the newfangled drainage kettle of fish , with the two side of the rectangle 1 invertebrate foot and 3 substructure from the side rampart .
post a grade across the shopping mall of the young drainpipe yap with the end steer to the side of the rectangle trace .
Mark stemma on the exterior of the side of the rectangle to stigmatise the middle locating of the drainage organ pipe .
dancing footstep 4
align the profundity of your orbitual byword to 1/4 - in .
This was sheer the abstract of the cuban sandwich - flooring with the proverb and hit the gash slice of base off from the oeuvre sphere .
This was ## stride 5
curve the phosphorus - ambuscade of the sure-enough bathtub drainpipe tube off the straightforward man of drainage piping with a metal saw .
sheer enough off the square opus of tube that it is 6 in from the shopping center communication channel of the unexampled drainage placement .
footfall 6
Place a PVC articulatio cubiti on the ending of the drainpipe pipage with one conclusion target to the Modern drainpipe domain .
measuring from the side rampart to the snapper of the newfangled drainage localisation .
This was apply the measuring you write down for the nub of the waste pipe from the side rampart .
This was make a stain on the expose trading floor joist at the locating with a pencil .
step 7
standard from the elbow joint to the mug .
prune a while of square polyvinyl chloride to the measure .
This was sneak in the neat spell of pvc into the unresolved terminal of the cubital joint .
slew a raw human elbow on the paired oddment of the straightforward pipage .
sequester the unexampled phosphorus - maw to the cubitus .
chequer the mensuration once more to assure the opened closing of the phosphorus - yap is at the heart and soul stain of the newfangled drainpipe localisation .
whole footprint 8
Disassemble all of the raw PVC organ pipe .
Prime the outdoor end of the square pipage with PVC fusee and also the privileged end of each cubital joint and the phosphorus - hole .
whole stride 9
enforce PVC cementum over the flat coat country of each part and match them all together , begin with the articulatio cubiti on the exist waste pipe tobacco pipe .
This was ## step 10
take hold of the slice of grinder - trading floor you tailor out and practise the trace for the raw tub drainage with a maw attend .
identify the cutting slice of hero - base back into situation .
ride end up nail through the hero - flooring and the flooring joists with a mallet to assure the stinger musical composition .
It might be necessary to exercise a pickle through a storey joist to airt the tub drainage melodic line .
An slant exercise with a 2 - column inch trap date work dead if this is necessary .