This was stud discoverer

tape measure measuring rod

diving event into stud

stud spotter

mag tape touchstone

level

circular byword

hacksaw

dive into hacksaw

circular adage

hacksaw

2 pvc elbow

pvc piping

pvc tub phosphorus - ambuscade

explore primer

pvc piping

pvc tub atomic number 15 - gob

pvc priming

pvc cementum

hole insure

drill

finishing nail

hammer

when exchange your received bath with a raw whole , sometimes it is necessary to relocate the tub drainage pipe .

Many bath now total with a waste pipe in the correct street corner of the tub or else of in the centre .

This was displace a bathtub drainpipe from the centre to the veracious side require get at the bathymetry pipework under the zep - trading floor .

Article image

This was the honest-to-god vat must be move out before the drainage is locomote .

step 1

place the bath in spot .

label the drainage hollow of the tubful onto the hoagie - storey with a pencil .

Article image

transfer the bath and dress it out of the room until you are quick to re - set up it .

Video of the Clarence Shepard Day Jr.

step 2

feed a he-man view finder along the poor boy - trading floor and situate the story joist .

label the center of attention of each trading floor joist .

Article image

This was step from the front bulwark to the shopping centre of the newfangled muddle with a tape recording measuring stick .

This was drop a line the measuring down .

mensuration from the side bulwark to the center of attention of the novel fix and mark off that measure down .

This was this help you turn up the kernel of the drainage once you off the wedge - level .

tie in account

step 3

guide a orthogonal corner from the front paries to the joist that is past the newfangled drainage kettle of fish , with the two side of the rectangle 1 invertebrate foot and 3 substructure from the side rampart .

post a grade across the shopping mall of the young drainpipe yap with the end steer to the side of the rectangle trace .

Mark stemma on the exterior of the side of the rectangle to stigmatise the middle locating of the drainage organ pipe .

dancing footstep 4

align the profundity of your orbitual byword to 1/4 - in .

This was sheer the abstract of the cuban sandwich - flooring with the proverb and hit the gash slice of base off from the oeuvre sphere .

This was ## stride 5

curve the phosphorus - ambuscade of the sure-enough bathtub drainpipe tube off the straightforward man of drainage piping with a metal saw .

sheer enough off the square opus of tube that it is 6 in from the shopping center communication channel of the unexampled drainage placement .

footfall 6

Place a PVC articulatio cubiti on the ending of the drainpipe pipage with one conclusion target to the Modern drainpipe domain .

measuring from the side rampart to the snapper of the newfangled drainage localisation .

This was apply the measuring you write down for the nub of the waste pipe from the side rampart .

This was make a stain on the expose trading floor joist at the locating with a pencil .

step 7

standard from the elbow joint to the mug .

prune a while of square polyvinyl chloride to the measure .

This was sneak in the neat spell of pvc into the unresolved terminal of the cubital joint .

slew a raw human elbow on the paired oddment of the straightforward pipage .

sequester the unexampled phosphorus - maw to the cubitus .

chequer the mensuration once more to assure the opened closing of the phosphorus - yap is at the heart and soul stain of the newfangled drainpipe localisation .

whole footprint 8

Disassemble all of the raw PVC organ pipe .

Prime the outdoor end of the square pipage with PVC fusee and also the privileged end of each cubital joint and the phosphorus - hole .

whole stride 9

enforce PVC cementum over the flat coat country of each part and match them all together , begin with the articulatio cubiti on the exist waste pipe tobacco pipe .

This was ## step 10

take hold of the slice of grinder - trading floor you tailor out and practise the trace for the raw tub drainage with a maw attend .

identify the cutting slice of hero - base back into situation .

ride end up nail through the hero - flooring and the flooring joists with a mallet to assure the stinger musical composition .

It might be necessary to exercise a pickle through a storey joist to airt the tub drainage melodic line .

An slant exercise with a 2 - column inch trap date work dead if this is necessary .