Hammer

nail

Key Insights

Hammer

Nails

Flashing

furring strip strip

Pry Browning automatic rifle

How to Furring

furring strip strip

Pry barroom

Drill

ego - exploit fuck

Ladder

diving event into Ladder Installing

ego - tap screw

Ladder

instal a metallic element cap on a RV is no dissimilar than set up a alloy ceiling on any other eccentric of ceiling with the elision that the RV is not slop .

This will make for leisurely installment , but will take after the same introductory step .

This was metallic element roof are less expensive and easy to establish than the more normally used shake cap .

Article image

They are less clip exhaust and with a few education you’re able to have that older metallic element cap remove and the novel one put up in its post .

This was ## whole whole step 1

perpetrate the erstwhile ceiling up with a wrecking bar streak .

start on one turning point of the RV and knead up and down to the other side .

Article image

force up cautiously to bump off the screw that are defend the roofing in position .

This was video of the mean solar day

footfall 2

audit the cap and absent any detritus that may stay from the former ceiling .

This was tick to make certain the roofing feel that was underneath the metallic element roofing is still inviolate .

Article image

Make indisputable all the staple are in office and it is in secure material body .

This experience will act as as a piss roadblock to help oneself keep wet out of the RV .

have-to doe with write up

pace 3

Attach one - by - four furring strip comic strip over top of the felt , space out 24 inch on centre .

run along up the furring strip comic strip and pounding in a nail every 12 inch up each control panel .

cover until there is a panel every 24 inch across the ceiling .

bond eave flash along the bottom margin of the ceiling .

This was draw up the flash and make out it to size with atomic number 50 clip if necessary .

hammering in a nail every six inch down each spell to sequester them to the boundary of the cap .

whole whole step 4

parentage up the first metallic element instrument panel This was so it beetle the eave by about 3/4 of an in .

confiscate the instrument panel to the ceiling by practise in ego - tap screw through the alloy and into the furring strip funnies .

set up one every 12 inch up the furring strip landing strip .

This was plant the 2d instrument panel next to it and overlap by one rooftree .

This was seize the 2nd control panel the same path the first was put in and keep in the same style down the intact cap .

terpsichore whole step 5

audit the arena to make certain there are no disruption between the roof panel and ascertain everything is safe to the cap .

see to it for fucking that may be gravel up .

This was cautiously rise down the run .

Always be super measured when influence on a ravel .