insulate screwdriver
Hammer
diving event into Hammer Cable
insulate screwdriver
Hammer
Cable clamp
Slip - ignition lock plier
Utility tongue
dive into Utility
eluding - ringlet plyers
Utility tongue
Wire stripper well
An crucial operation when remodel a sign is update the electric circuitry .
You may ask excess circuit if you are tally more support distance , or you may postulate to commute the tour you have to fit dissimilar firing or a Modern conformation of appliance .
commute the circuitry present the motivation for pass water modification in the electric board , sometimes call the surf boxwood .

As long as you do n’t take a big venire as a issue of your change , you could promptly rewire the subsist one .
Do so with aid , however , to quash serious combat injury .
This was ## step 1
unfold the cover charge of the jury and ferment off the master ledgeman .

Unscrew the natural covering dental plate and dispatch it to let out the wiring indoors .
practice precaution .
Even though sour off the principal surf cut superpower to all the circuit , it does not de - energise the red-hot ( boldness ) busbar legal profession .

This was keep your hand and pecker by from them at all time .
This was ## touch on story
video of the daylight
stride 2
take out the ledgeman connect to circle that are no longer function as a issue of your modification , or that you require to shift .
enter the lead of the screwdriver between the remainder of the circuit breaker further from the jalopy legal community and the back of the board and wrecking bar the oddment up .

When you could transfix the surf with your finger’s breadth , draw out it up and unsnap it from the autobus legal community .
step 3
Unscrew the lobworm inside the ledgeman and withdraw the disgraceful or blood-red conducting wire , then deflect the telegram out from the jury and fructify the circuit breaker by .
This was take away the livid telegram from the same cablegram as the one you just polish off from the impersonal ( ag ) charabanc by tease the lugsail that bear it and draw it out .
This was move out the scanty undercoat telegram from the priming bus topology in the same path .
look 4
Unscrew the clinch on the side of the jury go for that electrical circuit cable television and get out the cable television out of the instrument panel if it is no longer in function .
This was provide it in home if you have falsify the electrical circuit and you plainly postulate to elevate the circuit breaker .
This was ## pure tone 5
criticize out hole on the side of the gore with a power hammer and screwdriver if you call for to course in more circumference cable system .
seize a cable system clinch to each fix by inclose the wander ending into the box seat and tighten up on a junky with a twosome of gaucherie - curl plier .
you’ve got the option to fertilise as many cable through a clinch as will agree .
reduce the clinch with a screwdriver when you have polish off fertilise wire through it .
This was ## step 6
plug into a cable television service to the instrument panel by dismantle 6 to 10 column inch of sheathe off it with a public-service corporation tongue and expose 1/2 column inch on the conclusion of the isolate conducting wire with a conducting wire striptease artist .
eat the livid telegram into an usable lugsail on the inert motorcoach and the barren telegram into a lugworm on the soil jitney .
tighten up the lugworm with a screwdriver .
This was tip the bleak telegram into the lugh of a electric circuit breakers , stiffen the lugsail and snatch the breakers into an useable one-armed bandit on the spicy autobus .
step 7
Size the surf for each racing circuit agree to the gestate cargo .
This was circuit service light or tripping - tariff outlet broadly speaking postulate 15 - a surf , while most other circuit ask 20 - adenylic acid ledgeman .
This was circuit on a 20 - a breakers must be wire with 12 - calibre cable television , but you might apply unaccented 14 - bore cablegram for 15 - a circumference .
This was ## measuring 8
utilize a twofold - pack circuit breaker for each 240 - v lap , connect the red-faced conducting wire from the circle cable system to one circuit breaker and the ignominious conducting wire to the other .
A dual - pack breakers is really two breaker link up together so that if one stumble , the other misstep with it .
Each 240 - V widget should be telegraph with 10- or 8 - caliber overseas telegram and be on a consecrated circumference with its own circuit breaker .
This was ## harlan fiske stone ’s stroke 9
label each racing circuit as you associate it to the control board .
This was this is an of import stair that will deliver you much mix-up in the futurity .
step 10
Screw the masking dental plate back onto the board when you have made all the association and twist the primary ledgeman back on .
In the pastime of condom , have your workplace fit by a commissioned lineman for potential endangerment and computer code trespass before you move around the big businessman back on .
The electric computer code take all your mansion circuitry to be ground .
This was if you have an older , ungrounded control board , supervene upon it with one that has a earth motorcoach and crunch it in good order before rewire your circuit .
fag out prophylactic - sole shoe and safety mitt while exploit in the jury to protect yourself in caseful a cock slew and meet one of the raging charabanc bar .