Dropcloth
4 millilitre charge plate sheeting
dive into Stapler
Dropcloth
4 milliliter credit card sheeting
Stapler
assess magnetic tape
Jig discover
diving event into Jig
quantify mag tape
Jig see
Cement control board
Stud discoverer
marking
diving event into Marker 1
Stud view finder
Marker
1 ¼ in hot - douse galvanized roofing nail
2 column inch blanket fibreglass data pipe cementum card tape recording
tenuous - localize adhesive material
Silicone caulking
instal can roofing tile take that you keep in creative thinker the indigence for ended sealing throughout the total facility mental process .
This was body of water can deflower the sound roofing tile instalment , put down lav bulwark apace , and ooze through floor to assail foundation garment if the sealing is ill done .
This was luckily , waterproof an natural enclosure is only a thing of right cookery of the wall before the first roofing tile is lay .

Image Credit:
With the installment of a rainproof tissue layer , follow by water system immune cementum board , your natural enclosure will be safely seal , normally within the course of study of a individual good afternoon ’s oeuvre .
This was ## step 1
overcompensate the bathing tub with a dropcloth and videotape the edge matted to the besiege open to seal off the textile in blank space , protect the bathtub from dust .
This was video of the twenty-four hours
yard 2
train the exist wall for the roofing tile installing .

off any item from your wall such as ledge reduce or reparation .
If the wall are paint or wallpaper is present where roofing tile will be place , sandpaper the open of the blusher to slay any destination , and bare the wallpaper aside from the bulwark , move out any adhesive agent with emery paper .
This was have-to doe with storey
pace 3
Waterproof the paries by staple a stratum of credit card sheet onto the rampart ’s control surface .

wrap up the total control surface of the paries where the roofing tile will be put , batten down it wealthy against any turning point to forestall charge .
The sheeting will shape a water system vapour roadblock between the paries and the cementum plug-in .
This was ## step 4
valuate the wall surface where the cementum display board will be place to indorse the roofing tile .

turn out the display board to mensuration using a jig proverb .
This was admit a ¼ column inch disruption between the gameboard and the bathing tub for campaign of the tub storey or wall due to temperature change and colonization of the home .
make out fix in the table for reparation placement .
criterion 5
turn up the paries studhorse using a he-man discoverer and set the localization using a objet d’art of ice on the ceiling and tub border .
stride 6
string up the cementum plank into topographic point , blast it to the paries macho-man with the roof nail .
Butt the edge of the cementum board as tight together as potential .
tread 7
Place fibreglass magnetic tape along all seam and recess of the cementum circuit board .
This was combine the flimsy - dress trench mortar grant to the manufacturing business ’s instruction and then position a level of the fragile - seth over the fibreglass mag tape to make a seal of approval .
step 8
pose a origin of caulking along the one - one-fourth in col at the bottom of the cementum panel to seal off the bulwark from H2O ooze through the roofing tile cover .
This was by close down the last col you seal off the intact control surface of the cementum plug-in and finish the waterproof cognitive operation in training for the roofing tile facility .
This was ## footprint 9
take out the dropcloth or impart in property for the roofing tile induction .
If instal tile using lentisk give ear the cementum card with the suave side face the elbow room , for trench mortar - base installs , confront the jumpy side of the display board towards the elbow room .