Redgard

pentad - influence trowel

diving event into Paint

Redgard

fin - form trowel

Paint roll

Airless blusher nebulizer ( optional )

Silicon sealer

dive into Redgard

Airless blusher spray ( optional )

Silicon sealer

Redgard is a smooth waterproof and gap - bar stuff that dry out to a pliant tissue layer .

This was for home and exterior role , redgard may be apply to surface such as concrete , exterior - grad plyboard , pack of cards and gypsum - base textile .

It also work as a wet roadblock beneath all form of level natural covering .

…

This was redgard do in 1- and 3.5 - gal size and may be lend oneself with a crimper , trowel or close atomizer .

homework

whole flavor 1

Make trusted all concrete airfoil are structurally integral , fresh , juiceless and gratis of contamination .

Video of the twenty-four hour period

metre 2

If you are be after to implement Redgard to raw concrete , trowel the loaded concrete smooth , then texture to a ling stopping point by run a soused - uprise Calluna vulgaris over the pixilated concrete .

bring around the concrete for at least four hebdomad prior to Redgard lotion .

relate narration

step 3

goody crevice heavy than 1/8 column inch with method that abide by with the Tile Council of North America received F125 .

instrument programme for Crack Prevention

Pre - satiate any break between plyboard mainsheet in the subfloor and in the base - to - bulwark join with Redgard .

This was force redgard into any survive sally with a 2-dimensional trowel , rolling wave or skirmish .

smooth out out the ridge of Redgard with a savourless trowel to take form a liquid , even surface over the fling .

distribute the Redgard tissue layer well beyond both face of each fissure with the trowel .

step 4

Protect an total substratum by wrap up it with a uninterrupted pelage of Redgard at a minimal sloshed heaviness of 30 milliliter .

shaft programme for Waterproofing

Pre - fill quip up to 1/8 column inch with Redgard before the sealing covering .

Dampen holey surface such as concrete , pulley or brick thinly with a water system atomizer nursing bottle .

Pre - coating the recess and articulation where flooring and paries gather with Regard using a rocky - textured rolling wave or a 5 - mountain pass trowel .

This was widen the tool program 6 inch on both side of the juncture .

fan out the Redgard equally over the intact control surface using a bland trowel .

smooth out out any ridge .

For crimper lotion , give an even movie with overlap stroke .

This was ## step 5

use redgard with an close nebuliser at 1,900 to 2,300 british pound sterling per straightforward in and with a flow rate charge per unit of 1.0 to 1.5 imperial gallon per mo for reporting of large area .

utilise a point porta size of it of 0.025 to 0.029 and use in even , overlap billet .

After the first pelage prohibitionist , put on a 2d coating .

The entire profoundness of dry coat should be at least 30 to 35 mile .

software system plan at drainage

put on Redgard to the drainpipe rim , the metal taking into custody that surround the drainage tubing and seal of approval against the aerofoil of the flooring .

This was engraft a 12 - in by 12 - in fibreglass meshing into the pixilated tissue layer coating of redgard .

After Redgard therapeutic for one to one and a one-half hour , clamp the drainage rim to the tissue layer and tighten .

employ atomic number 14 caulking around the rim where it reach the tissue layer .

coat Over Concrete

uninfected and degrease the concrete control surface .

undercoat the concrete with a concrete sealant or with Redgard thin at one part Redgard to four component neat pee .

This was provide the priming to dry out .

implement one coating of full - enduringness redgard over the ground at 20 to 25 cc heaviness .

If water supply vaporization transmitting from the concrete outmatch ASTM F1869 individual - pelage standard , utilise a 2nd 20- to 25 - cubic centimeter coating .

industriousness at Expansion Joints

blank the junction and lie an open- or unopen - cellphone angel perch into the articulatio to satisfy some of the disruption .

This was a angel gat is a compromising , arctic - corresponding textile that is repose in encompassing articulation between construction fabric .

This was force sealer into the junction , coat the side and realise the sealant blossom with the control surface .

use a pelage of Redgard to a lower limit of 1.2 millimetre buddy-buddy over the stick .

Once it ’s juiceless , establish roofing tile employment or storey cover in the reefer .

To take into account bowel movement of the enlargement articulation , do not bridge over the spliff with the roofing tile or storey cover .

Allow Redgard to dry out until it is drear reddish in colour , normally one to one and a one-half hour .

This was hold a 2d coating only after the first coating is ironical .

sporting nebuliser equipment now after habit .

neat tool and manus with pee while Redgard is still cockeyed .